Case studies
Our case studies provide detailed insights into applications where RACOM products have been successfully deployed. Through specific examples, you will see how our solutions contribute to secure and reliable operations across various industries worldwide, how they efficiently address technical challenges, and how the entire implementation process was carried out.
In well-structured documents, you will learn about the challenges our customers faced, the solutions we proposed, why they were optimal in a broader context, and the benefits they delivered.
Power distribution
Full duplex p-t-p links
1.6 Mbps
99,9% availibility
19‘ rack installation
Rio de Janeiro
Power distribution
Siemens and ABB RTU's
RP-570, IEC101, IEC104
AES 256 encryption
Backup routes
Over 100 sites
Power distribution
Extreme Middle East climatic conditions
DNP3 protocol
Backup routes, Multi repeaters
Press release
5000 sites planned
Hybrid network
Power distribution
Tropical environment
Up to four repeating hops
Multi-master
IEC101, IEC104 and DNP3
Ethernet and Serial Interface
Cisco, Vigor… in the centre
Sub-tropical climate
IEC101 and IEC104
Over 1000 remotes
Power and Water Distribution
Base driven protocol
DNP3
Ongoing migration
DPSK to 256 QAM
25 kHz bandwidth
Remote meter reading
Two levels backhaul
Base Driven Protocol
TCP/IP