Case studies
Our case studies provide detailed insights into applications where RACOM products have been successfully deployed. Through specific examples, you will see how our solutions contribute to secure and reliable operations across various industries worldwide, how they efficiently address technical challenges, and how the entire implementation process was carried out.
In well-structured documents, you will learn about the challenges our customers faced, the solutions we proposed, why they were optimal in a broader context, and the benefits they delivered.
Power distribution
Full duplex p-t-p links
1.6 Mbps
99,9% availibility
19‘ rack installation
Rio de Janeiro
M!DGE
Water Management
Hybrid network
Flexible protocol
Back up routes
Fully redundant data centres
Avalanche protection
Hydrometric services
Solar powering - Sleep mode
Temperatures below -30 °C
Altitude up to 3400 m
7500 km², 100 units
Power distribution
Siemens and ABB RTU's
RP-570, IEC101, IEC104
AES 256 encryption
Backup routes
Over 100 sites
Power distribution
Extreme Middle East climatic conditions
DNP3 protocol
Backup routes, Multi repeaters
Press release
5000 sites planned
Water well management
Installation in desert, over +50 °C
High reliability
Long distances - 10W
Modbus protocol
One Master & 64 remotes
Hybrid network
Power distribution
Tropical environment
Up to four repeating hops
Multi-master
IEC101, IEC104 and DNP3
Mesh RF backbone
Dynamic routing (BABEL)
Solar powered nodes
LTE failover
Power and Water Distribution
Base driven protocol
DNP3
Ongoing migration
DPSK to 256 QAM
25 kHz bandwidth
Underground
Leaky Feeder
256QAM
Point to Multipoint
DMR Tier 3
Voice Network
Base station interconnection
Full duplex p-t-p links
50 kHz channel, 64 QAM, 250 kbps
Mountain area, NLOS
Remote meter reading
Two levels backhaul
Base Driven Protocol
TCP/IP